新闻资讯
  • news
  • 咨询热线:
  • 0531-87568508
  • 18653128690
  • 公司新闻
  • 您现在的位置:首页 > 新闻资讯 > 公司新闻 >
  • 正压状态是静脉药物配置的基本需求
    来源:http://www.sdyhrs.com 浏览: 发布日期:2018-05-14
      1、层流手术室手术部各区域的缓冲区,应当设有明显标识和屏障,各区域的门应当保持关闭状态,并有连锁装置,不可同时打开出、入门。

      1. The buffer zones in each area of the operating Department of the operation room should be marked with obvious signs and barriers. The doors in each area should be kept closed, and there are chain devices that should not be opened and started at the same time.

      2、进入层流手术室手术部清洁区、洁净区域内的人员应更换产尘埃少的专用工作服。

      2. To enter the laminar flow operation room, cleanliness areas and clean areas should be replaced by special work clothes with less dust.

      3、层流手术室净化在手术中应保持正压状态,洁净区与相邻洁净区的静压差应符合标准(I、II 级> 8pa;III、IV级> 5 pa;洁净区对非洁净区>10 pa.)要求。
    静脉药物配置中心

      3, the laminar flow operation room purification should keep the positive pressure in the operation. The static pressure difference between the clean area and the adjacent clean area should be in accordance with the standard (I, II, 8PA; III, IV > 5 Pa; clean area >10 Pa. in the unclean area).

      4、医务人员应在气流的上风侧进行无菌技术操作,有对空气可能产生污染的操作应选择在回风口侧进行。

      4, medical personnel should carry out aseptic technology operation on the windward side of the airflow, and the operation of air pollution may be selected on the side of the return air outlet.

      5、层流手术室手术部的净化空调系统应当在手术前30分钟开启。

      5, the laminar flow operation room operation Department's clean air conditioning system should be opened 30 minutes before the operation.

      6、层流手术室净化温度应控制在22℃~25℃,相对湿度为40%~60%,噪声为40~50分贝,手术室照明的平均照度为500LX左右。

      6. The purification temperature of the laminar flow operation room should be controlled at 22 to 25 C, the relative humidity is 40% ~ 60%, the noise is 40~50 decibels, and the average illumination of the operation room lighting is about 500LX.

      7、层流手术室净化的净化空调系统应当连续运行,直至清洁、消毒工作完成。Ⅰ~Ⅱ级用房的运转时间为清洁、消毒工作完成后20分钟,Ⅲ~Ⅳ级用房的运转时间为清洁、消毒工作完成后30分钟。

      7. The purified air conditioning system in laminar operation room should be run continuously until the cleaning and disinfection work is completed. The operation time of class I to grade II was 20 minutes after cleaning and disinfection, and the operation time of class III to IV was clean and disinfection work was completed for 30 minutes.

      本文由静脉药物配置中心为您提供,我们的网站是:http://www.sdyhrs.com/我们将以全心全意的热情为您提供更优质的服务,欢迎您的访问!

      This article is provided by the venous drug distribution center for you. Our website is: http://www.sdyhrs.com/ we will provide you with more quality service and welcome your visit with wholehearted enthusiasm.

    上一篇:C模式和EC模式哪个更适合层流手术室
    下一篇:层流手术室解决了手术室的卫生条件