    高等级手术室空调体系宜独立设置。所谓天层流手术室装修是指千级以上手术室,其原因是高等级手术室空调送风量大,如相同面积的手术室,百级手术室的空调风量是十万级的3.4倍,是万级的2.25倍。
    The air conditioning system of high grade operation room should be set independently. The so-called day decoration refers to the 1000 laminar flow operation room operation room above, the reason is the high grade operation room air volume in the same area, such as the operation room, operation room 100 air volume is 3.4 times one hundred thousand, 2.25 times the million level.
    别的高等级手术室的运用频率远低于低等级手术室,这么不管是一个空调体系担负多个高等级手术室,或是一个空调体系担负一个高等级手术室和多个低等级手术室,都会使空调体系长时间处于"大马拉小车"的运转状况。
    The frequency of other high level is far lower than the low level of operation room operation room, so whether it is an air conditioning system for a number of high-grade operation room, or an air conditioning system for a high level and a low level of operation room operation room, will make the air conditioning system for a long time in the "big car Mara" operation.
    层流手术室装修
    例如一个空调体系担负1间百级手术室和2间万级手术室或4间十万级手术室,只需高等级手术室不运用,则体系规划风量少大于此刻所需风量的112%和84%,层流手术室装修亦即此刻体系所需风量仅为体系规划风量的47%和54.3%,并且此种因手术室运用与否引起的风量改变,不宜选用变频调速方法进行调理,只能用调理总风阀的方法调理风量以习惯体系风量改变,但是此种方法明显不节能。所以不管从节约能源的视点,或是从运用可*性、灵活性的视点,高等级手术室都应"按间"独立设置空调体系,即一个净化空调体系对应一间手术室。
    For example, an air conditioning system for 1 100 and 2 000 operation room operation room or 4 grade one hundred thousand operation room, operation room only high grade is not used, the system planning volume at the moment at least greater than the required air volume of 112% and 84%, which is now the decoration of laminar flow operation room system required air volume is only 47% and the air volume system planning 54.3%, and the volume for operation room use and not caused by change, should not use the frequency control method of conditioning, can only use the method of conditioning air valve air conditioning total change to customary system volume, but this method was not such. Therefore, no matter from the viewpoint of energy saving or from the point of view of using flexibility and flexibility, the operation room should set up an air conditioning system independently, that is, a clean air conditioning system corresponding to an operation room.
    关于低等级手术室,虽然与高等级手术室比较空调风量小的多,但一个空调体系所担负的手术室间数也不宜过多,由于层流手术室装修工程医院手术室的运用状况具备不确定性。愈是高等级医院,手术室为满足特别繁忙状况,设置愈多。
    A low level of operation room, although compared with the high level of operation room air volume is small, but for an air conditioning system of the operation room room number should not be too much, because of the use of decoration project of the hospital operation room laminar flow operation room with uncertainty. The higher the level of the hospital, the operation room in order to meet the special busy situation, the more settings.
    手术室多,正常状况下的一起运用系数低,这么当一个空调体系所担负的手术室间数较多时,体系常处于"供大于求"的状况,其运转能耗势必较高,就象有的医院所反映的"建的起,用不起"。笔者以为,关于低等级手术室一个空调体系所担负的手术室不宜多于四至五间,并且一个体系担负手术室过多,也会形成运用上的不行。
    Operation room, under normal conditions with the use factor is low, so when taking an air conditioning system in the operation room room number is large, the system often is in oversupply situation, the energy consumption is high, as some hospitals reflect "built up, can not afford". I think, on the low grade operation room, an air-conditioning system, the operation room should bear more than four to five, and a system responsible for the operation room too much, but also the formation of the use of not.