  • 浅析手术室装修要求有哪些?
    来源:http://www.sdyhrs.com 浏览: 发布日期:2021-01-06
    医院装修设计中手术室的设计包括ICU、MICU及各类实验室、检验室等等特殊空间。手术室根据规模大小,按比例合理分割统筹考虑,包括房间设置、设施摆放、通道划分,医护人员与病员、家属之间的关系,要求有序。装修后的手术室不仅能很好地满足使用功能的要求,也为医护人员和患者营造了一个良好的医疗环境。
    In the hospital decoration design, the design of operating room includes ICU, MICU and all kinds of laboratory, laboratory and other special space. According to the size of the operating room, the operating room should be reasonably divided according to the proportion, including the room setting, facility placement, channel division, and the relationship between the medical staff and the patients and their families. The operating room after decoration can not only meet the functional requirements, but also create a good medical environment for medical staff and patients.
    医院手术室装修要求如下:
    The decoration requirements of hospital operating room are as follows:
    一、手术室装修的要求
    1、 Requirements for decoration of operating room
    不产尘、不积尘、耐腐蚀、防潮、防霉、防火、易清洁。色彩要温和、淡雅,可为淡绿色、淡黄色。绿色与血液的红色互为补色,能减轻医护人员用眼疲劳,并对患者心理有平静作用。黄色有平衡情绪低落作用,避免与绿色墙面趋同。电气设计、净化空调设计、医用气体管线及终端设计等均应按化要求进行室内设计与装修施工。
    No dust, no dust, corrosion resistance, moisture, mildew, fire, easy to clean. The color should be mild and elegant. It can be light green and light yellow. Green and red of blood complement each other, which can reduce eye fatigue of medical staff and calm the psychology of patients. Yellow can balance depression and avoid convergence with green wall. Electrical design, purification air conditioning design, medical gas pipeline and terminal design should be carried out according to the professional requirements of interior design and decoration construction.
    二、手术室装修整体要求
    2、 Overall requirements of operating room decoration
    装修公司装修时包括ICU、MICU及各类实验室、检验室等等特殊空间。手术室的准备区、隔离区和手术区——三大区域,根据规模大小,按比例合理分割统筹考虑,包括房间设置、设施摆放、通道划分,医护人员与病员、家属之间的关系,要求有序。装修后的手术室不仅能很好地满足使用功能的要求,也为医护人员和患者营造了一个良好的医疗环境。
    When the decoration company decorates, it includes ICU, MICU and all kinds of laboratories, inspection rooms and other special spaces. The preparation area, isolation area and operation area of the operating room should be reasonably divided according to the scale, including room setting, facility placement, channel division, and the relationship between medical staff, patients and their families. The operating room after decoration can not only meet the functional requirements, but also create a good medical environment for medical staff and patients.
    三、手术室装修六面体要求
    3、 Hexahedron requirements of operating room decoration
    地面。应平整,采用耐磨、防滑、耐腐蚀、易清洗、易起尘及不开裂装饰材料,手术室可选用防静电、抗菌、防火、耐磨的橡胶地板、淡黄色PVC地板;万级手术室可选用米黄色水磨石板或人造石地板。注意橡胶地板或人造石地板,连同地面联成一体的阴角处理。墙面——成型铝板或塑铝板墙裙、防水矶理纹乳胶漆,做好接缝。水磨石宜用425号或以上水泥,石子粒径5~15mm,以防止开裂、掉石子、起砂。地面不宜设地漏,否则应有防室内空气污染措施——如设置高水封地漏。
    The ground. It should be flat, wear-resistant, anti-skid, corrosion-resistant, easy to clean, easy to dust and non cracking decorative materials. Anti static, antibacterial, fireproof, wear-resistant rubber floor and light yellow PVC floor can be used in the operating room; beige terrazzo or artificial stone floor can be used in the 10000 grade operating room. Pay attention to the rubber floor or artificial stone floor, together with the floor into one of the internal corner treatment. Wall surface: formed aluminum panel or plastic aluminum panel wainscot, waterproof jiliwen emulsion paint, good joint. Cement 425 or above should be used for terrazzo, and the particle size of stone is 5-15mm to prevent cracking, stone falling and sanding. The floor drain should not be set on the ground, otherwise the indoor air pollution prevention measures should be taken, such as setting high water seal floor drain.
    天花。需布置、安装过滤送风口、照明灯具、烟感灭火器等,各种管线均应隐藏在顶棚内。可选用轻钢龙骨600×600mm乳白色彩钢净化板吊顶,按缝用密封胶压条处理。天花顶面无影灯为暗装,可为二级顶面,二级顶两侧采用电动轨道,自动开合,尽可能减少污染。天花也可用铝扣板吊顶。
    Smallpox. It is necessary to arrange and install high efficiency filter air supply outlet, lighting lamps, smoke extinguisher, etc., and all kinds of pipelines should be hidden in the ceiling. The light steel keel 600 × 600mm milky white color steel purification plate ceiling can be selected, and the joint shall be treated with sealant. The shadowless lamp on the top of the ceiling is concealed, which can be a secondary top. The electric track is used on both sides of the secondary top to automatically open and close, so as to reduce pollution as much as possible. The ceiling can also be suspended with aluminum gusset plate.
    门窗。应采用防尘密封隔音效果优良的中空双层窗,可选用不锈钢或塑钢专用窗。门应采用自动感应式电动彩色钢板推拉门,并装有延时器,以避免手术中人员进行频繁而出现的“开着门作手术”的现象。
    Doors and windows. The hollow double-layer window with excellent dust-proof sealing and sound insulation effect shall be adopted, and the special window made of stainless steel or plastic steel can be selected. The door should adopt automatic induction type electric color steel plate sliding door, and be equipped with time delayer, so as to avoid the phenomenon of "operation with the door open" which occurs frequently during the operation.