新闻资讯
  • news
  • 咨询热线:
  • 0531-87568508
  • 18653128690
  • 公司新闻
  • 您现在的位置:首页 > 新闻资讯 > 公司新闻 >
  • 层流手术室的施工有哪些要求
    来源:http://www.sdyhrs.com 浏览: 发布日期:2022-05-31
    层流手术室的建设和建设应符合医院清洁手术部的建设标准,符合国家现行的医疗清洁标准、标准、层流手术室的设计应反映技术、设备和经济实用的原则,同时考虑美观和维护方便,确保层流手术室的运行。以下是关于层流手术室的施工要求。
    The construction and construction of the laminar flow operating room shall comply with the construction standards of the clean operating Department of the hospital and the current national medical cleaning standards and standards. The design of the laminar flow operating room shall reflect the principles of technology, equipment, economy and practicality, while taking into account the aesthetics and convenient maintenance to ensure the operation of the laminar flow operating room. The following are the construction requirements for laminar flow operating room.
    华锐净化手术室装修效果。
    Decoration effect of Sinovel purification operating room.
    层流手术室施工要求。
    Construction requirements for laminar flow operating room.
    ①手术部与放射、病理、消毒、供应、血库相似,接近外科护理。
    ① The operation Department is similar to radiology, pathology, disinfection, supply and blood bank, and close to surgical nursing.
    ③手术部平面布置:功能流程短,清洁污染清晰,疏散方便。单走廊应采取当地污染物消毒包装措施(指问题解决方案),加强消毒灭菌。双走廊(三走廊)分为清洁走廊和清洁走廊,可分为清洁污染分流物分流。
    ③ Plane layout of the operation Department: short functional process, clear cleaning and pollution, and convenient evacuation. Local pollutant disinfection and packaging measures (referring to problem solutions) shall be taken for single corridor to strengthen disinfection and sterilization. Dual corridor (three corridor) is divided into clean corridor and clean corridor, which can be divided into clean pollution diversion and diversion.
    手术室净化工程。
    Operating room purification works.
    ④一、二级手术室应位于干扰小的区域,污染负压或正负压转换手术室应位于进口附近,有独立缓冲室,周围干扰小。
    ④ Level I and level II operating rooms shall be located in the area with little interference. The operating room with polluted negative pressure or positive and negative pressure conversion shall be located near the inlet, with an independent buffer room with little interference around.
    ⑤净化通道应连续,非净化部分不得切断(切断;切断)。
    ⑤ The purification channel shall be continuous, and the non purification part shall not be cut off (cut off; cut off).
    ⑥人、物电梯不得位于洁净区,若只能位于洁净区,出口处应加缓冲。
    ⑥ Personnel and object elevators shall not be located in the clean area. If they can only be located in the clean area, buffer shall be added at the exit.
    ⑦换车时应设置缓冲间。缓冲间的净化水平与高洁净区相同。
    ⑦ A buffer room shall be set when changing trains. The purification level of the buffer room is the same as that of the high clean area.
    ⑧刷手应适当集中,2~4个手术室应设置刷手间。成都手术室装修公司采用层流手术室,加强无菌理念和正式管理仍然是医疗的基本保证和要求,仍然是手术室工作的基础,只有当两者紧密结合时才趋于。
    ⑧ Brush hands shall be properly centralized, and brush hands room shall be set in 2~4 operating rooms. Chengdu operating room decoration company adopts laminar flow operating room. Strengthening aseptic concept and formal management is still the basic guarantee and requirement of medical treatment, and is still the basis of operating room work. Only when the two are closely combined can it tend to.
    ①踢脚与地图R≥40mm,其他交界处应为小圆角或>90o角,踢脚凹入墙面或与墙面平整。
    ① The skirting and the map R ≥ 40mm, other junctions shall be small rounded corners or >90o angles, and the skirting shall be recessed into the wall or leveled with the wall.
    ②通道两侧设有防撞带。
    ② Anti collision belts are set on both sides of the passage.
    ③手术室高度2.8~3.0m,手术室门净宽≥1.4m。无菌手术室装修采用不同程度的空气清洁技术控制微生物污染,满足空间环境中空气清洁度的要求,提供适当的温湿度,创造清洁的手术空间环境。由于手术室应严格控制低细菌数量和低麻醉气体浓度。
    ③ The height of the operating room is 2.8~3.0m, and the clear width of the operating room door is ≥ 1.4m. The decoration of sterile operating room adopts different levels of air cleaning technology to control microbial pollution, meet the requirements of air cleanliness in the space environment, provide appropriate temperature and humidity, and create a clean operating space environment. The operating room should strictly control the number of low bacteria and low anesthetic gas concentration.
    ④手术室地面应防静电(静态电荷)。
    ④ The floor of the operating room shall be anti-static (static charge).
    ⑤手术室应无窗户,清洁辅助室三,四级可有双层封闭窗。
    ⑤ The operating room shall have no windows, and the cleaning auxiliary room III and IV may have double-layer closed windows.
    ⑥各种管道应秘密安装。成都手术室装修公司采用层流手术室,加强无菌理念和正式管理仍然是医疗的基本保证和要求,仍然是手术室工作的基础,只有当两者紧密结合时才趋于。
    ⑥ Various pipelines shall be installed secretly. Chengdu operating room decoration company adopts laminar flow operating room. Strengthening aseptic concept and formal management is still the basic guarantee and requirement of medical treatment, and is still the basis of operating room work. Only when the two are closely combined can it tend to.
    设计原则:
    Design principle:
    层流手术室装修工程应符合《医院清洁手术部建设标准》,符合国家现行相关标准和标准的规定。设计应体现技术、先进设备与经济实用相结合的原则,并考虑美观、维护方便,确保运行可靠。
    The decoration works of laminar flow operating room shall comply with the construction standard of hospital clean operating department and the provisions of current relevant national standards and standards. The design shall reflect the principle of combining technology, advanced equipment and economy and practicality, and consider aesthetics and convenient maintenance to ensure reliable operation.

    上一篇:重症监护室的净化建设要求
    下一篇:最后一页